| Dec 1st 2006 | | The Seguin "ZAC" mixed development zone in Boulogne Billancourt off to a flying start. - TRAVAUX - N°836 |
| Dec 1st 2006 | | Barrettes cut off precisely
without vibration in an Airbus plant - TRAVAUX - N°836 |
| Dec 1st 2006 | | Use of the Trenchmix® process for the production of watertight barriers. - TRAVAUX - N°836 |
| Dec 1st 2006 | | Mexico : the 4,000 piles
of the Pemex refinery in Minatitlan. - TRAVAUX - N°836 |
| Nov 1st 2006 | | Monitoring along the way of the new line 4
of the Budapest subway. - AFTES - TUNNELS ET OUVRAGES SOUTERRAINS - N°198 |
| Nov 1st 2006 | | Directional drilling allows easy crossing of the Malakoff intersections and the Sambre canal. - TRAVAUX - N°835 |
| Nov 1st 2006 | | The "Bois de Peu" road tunnel.
Voie des Mercureaux, Besançon, France. - AFTES - TUNNELS ET OUVRAGES SOUTERRAINS - N°198 |
| Nov 1st 2006 | | From Tuen Mun to Tsz Wan Shan, the tribulations of a French tunneller to serve China Light & Power Hong Kong - TRAVAUX - N°835 |
| Nov 1st 2006 | | The Pointe Pescade Main Sewer, Algiers. - AFTES - TUNNELS ET OUVRAGES SOUTERRAINS - N°198 |
| Oct 1st 2006 | | Record at Sables-d'Olonne :
CSM Bessac builds an undersea tunnel 623 metres long, by microtunnel boring machine. - TRAVAUX - N°834 |
| Oct 1st 2006 | | To build the Monegasque Institute of Sports Medicine on solid foundations, the building and underground works trades join forces. - TRAVAUX - N°834 |
| Oct 1st 2006 | | The El Teniente mine in Chile :
a fine exercise ground for a specialist in tunnels and related geotechnical - TRAVAUX - N°834 |
| June 1st 2006 | | Adaptable reclamation of an industrial site
in Granville - TRAVAUX - N°831 |
| June 1st 2006 | | Reclamation of the Metaleurop North site.
Inertec’s expertise in hazardous waste treatment - TRAVAUX - N°831 |
| May 1st 2006 | | Isséane.
As of the foundation stage, the cult of environmental conservation - TRAVAUX - N°830 |
| May 1st 2006 | | Valenton VL10.
A tunnel of dia 4m for sewerage executed by CSM Bessac Earth Pressure Balance TBM - TRAVAUX - N°830 |
| April 1st 2006 | | Saintes archipelago.
The new wharf on Terre de Haut island. - TRAVAUX - N°829 |
| April 1st 2006 | | Renovation of the Capitol in the State of Virginia.
Geotechnics come to the aid of History by combining advanced technologies. - TRAVAUX - N°829 |
| April 1st 2006 | | Teesta Dam Stage 5 in Sikkim.
Cutoffs by jet grouting and grout injection. - TRAVAUX - N°829 |
| April 1st 2006 | | From the Mekong to the Yangtse.
Special foundations fot two large bridges. - TRAVAUX - N°829 |
| April 1st 2006 | | Madrid.
Workers are busy on the foundations of the Madrid Rio Project for the M30 urban motorway. - TRAVAUX - N°829 |
| Jan 1st 2006 | | A CSM Bessac microtunneller passes through the subsoil of Poitiers, unobserved. - TRAVAUX - N°826 |
| Jan 1st 2006 | | Discretion and urbanity: the hallmaks of a noble tradition in geotechnical engineering. - TRAVAUX - N°826 |
| Jan 1st 2006 | | The Chevalley Intersection, a major urban road project in Algiers.
Prototype for a series ? - TRAVAUX - N°826 |
| Jan 1st 2006 | | Paul Klee car park in Paris : turnkey project requiring expertise in geotechnical works. - TRAVAUX - N°826 |
| Jan 1st 2006 | | Sofia Plaza: 32 m under the ground in Kiev and 131 m above. - TRAVAUX - N°826 |
| Nov 1st 2005 | | Soil improvement techniques applicable to formation levels. Latest developments. - TRAVAUX - N°824 |
| Sept 1st 2005 | | Urban monitoring during drilling of Barcelona Metro Line 9. - TRAVAUX - N°822 |
| Sept 1st 2005 | | The role of real-time monitoring in the construction of large underground structures. - AFTES - TUNNELS ET OUVRAGES SOUTERRAINS - N°185 |
| July 1st 2005 | | MEDIAN : an intuitive positioning driller. - TRAVAUX - N°821 |
| July 1st 2005 | | Solbarrière : an anti-flood barrier, light and removable. - TRAVAUX - N°821 |
| July 1st 2005 | | T.Pile grooved piles. - TRAVAUX - N°821 |
| July 1st 2005 | | The CSM wall.
An innovative treated soil wall solution. - TRAVAUX - N°821 |
| June 1st 2005 | | A hydro-cutter on the RD 10 shaft in Viroflay : large structure, large facilities. - TRAVAUX - N°820 |
| June 1st 2005 | | The Collabos road tunnel (Spain). The installation of connecting galleries between two tunnels using horizontal raise boring. - AFTES - TUNNELS ET OUVRAGES SOUTERRAINS - N°189 |
| May 1st 2005 | | The Montmorot clarifier: a turnkey structure incorporated in a circular diaphragm wall. - TRAVAUX - N°819 |
| May 1st 2005 | | Stabilisation of the "Grand Littoral" in Marseille. - TRAVAUX - N°819 |
| May 1st 2005 | | The Bercy-Tolbiac foot bridge : complex foundations to cross the Seine elegantly and ingeniously - TRAVAUX - N°819 |
| May 1st 2005 | | Méré : a turnkey raising tank, in very quick time. - TRAVAUX - N°819 |
| May 1st 2005 | | Development of technology for monitoring railway tracks during underground work. - TRAVAUX - N°819 |
| March 1st 2005 | | Port of Barcelona : dynamic, controlled expansion right down to the foundations of the new dykes. - TRAVAUX - N°817 |
| March 1st 2005 | | Palm Island (Dubai). Is the "Eight Wonder of the World" really visible from the moon ? - TRAVAUX - N°817 |
| March 1st 2005 | | Valenton, France, VL 10 project. Excavation of a 4m-dia interceptor with an EPB -TBM. - AFTES - TUNNELS ET OUVRAGES SOUTERRAINS - N°188 |
| Jan 1st 2005 | | Saint-Martin-le-Beau. Example of reclamationof a rubbish tip with environmental improvement. - TRAVAUX - N°815 |
| Nov 28th 2003 | | Underground structures for storm water storage tanks - AFTES - TUNNELS ET OUVRAGES SOUTERRAINS - N°180 |
| Nov 3rd 2003 | | Renovation of
Pont Royal bridge
over the Seine in Paris - TRAVAUX - N°802 |
| Oct 2nd 2003 | | Charles-de-Gaulle Airport Terminal 2.
Earthworks and diaphragm walls for the new luggage sorting centre - TRAVAUX - N°801 |
| Oct 2nd 2003 | | The refrigerator on Cours Albert 1er in Paris VIIIe - TRAVAUX - N°801 |
| Oct 2nd 2003 | | Reconstruction of the
Saint-Martin Canal in Paris - TRAVAUX - N°801 |
| Oct 2nd 2003 | | The Copenhagen underground railway.
No subsidence, no nuisance. - TRAVAUX - N°801 |
| Sept 2nd 2003 | | Rehabilitation of the deballasting lagoon at Brest. Application of an innovative solution by active chamber and in-situ stabilisation - TRAVAUX - N°800 |
| July 31st 2003 | | Research, development and innovation, driving forces for international development - TRAVAUX - N°799 |
| May 2nd 2003 | | Techniques for underground storm-water tanks - TRAVAUX - N°797 |
| April 2nd 2003 | | Record foundations for
Mega Tower in Hong Kong - TRAVAUX - N°796 |
| April 2nd 2003 | | Penny's Bay (Hong Kong): geotechnical study,
vibratory compacting, instrumentation,
detailed analysis - TRAVAUX - N°796 |
| Dec 2nd 2002 | | Sacramento (California)
Sealing the levee on the right bank of American River with a soil-cement-bentonite wall - TRAVAUX - N°792 |
| Dec 2nd 2002 | | Dublin
The design and construction at Sir John Rogerson's Quay - TRAVAUX - N°792 |
| Nov 2nd 2002 | | Repair and renovation works on the Paris underground - TRAVAUX - N°791 |
| Nov 2nd 2002 | | The Grand Palais
Foundation renovation works and control instrumentation - TRAVAUX - N°791 |
| Oct 1st 2002 | | The Toulouse metro
Extension of Line A - TRAVAUX - N°790 |
| Sept 2nd 2002 | | Lievin: design and construction
of the Dussouich basin - TRAVAUX - N°789 |
| Aug 1st 2002 | | Three main construction
of interceptors
in Yvry-sur-Seine - AFTES - TUNNELS ET OUVRAGES SOUTERRAINS - N°172 |
| Aug 1st 2002 | | Evolution of the monitoring techniques in real-time applied on
urban tunnelling works - AFTES - TUNNELS ET OUVRAGES SOUTERRAINS - N°172 |
| April 4th 2002 | | Construction of a dry-dock in the port of Concarneau - TRAVAUX - N°785 |