Regardless of site size, and providing it involves a significant proportion of works in the ground, Soletanche Bachy will handle the complete project, and all aspects of the works, including site supervision, excavations, foundations, civil engineering and all construction operations.
When it operates as a general contractor, Soletanche Bachy uses on its own resources to undertake all complex geotechnical operations, rather than relying on subcontractors.
Examples of structures constructed as general contractor
- - Underground car parks
- Storage tanks and drainage
- Cut and cover structures and tunnels
- Marine and river construction
Download the Geotechnical and Main Contractors Works
EntrepriseGénéraleVa.pdfRéalisations
Work : UNDERGROUND CAR PARKS ,URBAN EXCAVATIONS | Year : 1997 | Location : FRANCE
Design and construction of 10-level 295 place underground car park.
Work : MARITIME WORK | Year : 2002 - 2003 | Location : URUGUAY
Turnkey design and build contract for a port logistics terminal.
Work : SEWERAGE,STORM WATER TANK | Year : 2008 | Location : FRANCE
Construction of a 3,500m3 capacity storage tank.
Work : UNDERGROUND CAR PARKS ,URBAN EXCAVATIONS | Year : 2006 2008 | Location : FRANCE
Construction as a main contractor of a cylindrical underground car park comprising 7 basement levels.
Work : MARITIME WORK | Year : 2007 | Location : BELGIUM
Rehabilitation of a river lock
Work : UNDERGROUND CAR PARKS ,URBAN EXCAVATIONS | Year : 2005-2007 | Location : FRANCE
Acting as the main contractor for the construction of an underground car park in Saint-Germain-en-Laye
Work : RAILWAY WORKS,TUNNELS | Year : 2008 | Location : FRANCE
Upgrade of tunnels, creation of an underpass, construction of a bridge and other civil engineering works to modernize a railway.
Work : UNDERGROUND CAR PARKS ,URBAN EXCAVATIONS | Year : 1997 | Location : FRANCE
Design and construction of 6-floor 430 place underground car park.
Work : BUILDING,URBAN EXCAVATIONS | Year : 1996 | Location : MONACO
A turnkey 17 000 m2 excavation.
Work : ROAD STRUCTURES,TUNNELS | Year : 2005-2006 | Location : MONACO
Road tunnel excavated through rock, 55 to 85 m² excavated section
Work : MARITIME WORK | Year : 2001 | Location : FRANCE
Design and construction as main contractor of dry dock, length 130m, width 27m, depth 10.80m.
Work : UNDERGROUND CAR PARKS ,URBAN EXCAVATIONS | Year : 1995 | Location : FRANCE
Design and construction of 5-level 320 place underground car park.
Work : MARITIME WORK | Year : 2009 | Location : MEXICO
Construction of a terminal for constructing and launching offshore oil platforms
Work : MARITIME WORK | Year : 2006-2008 | Location : FRANCE
Widening and modernisation of Dry Dock N°1 at the Brest Port de Commerce.
Work : MARITIME WORK | Year : 2004 | Location : GREECE
Construction of a breakwater and a quay wall made of box caissons.
Work : MARITIME WORK | Year : 2009 | Location : URUGUAY
Constructing an extension to the Cuenca del Plata port terminal as a general contractor
Work : REHABILITATION OF STRUCTURES AND UNDERPINNING WORKS | Year : 2001 - 2003 | Location : FRANCE
Underpinning the “Grand Palais”, built in 1900 and protected as a National Heritage monument, and creating a new retaining wall for a future underground structure in the main hall.
Work : METROS,RAILWAY WORKS,SHAFTS,TUNNELS | Year : 2001 - 2005 | Location : FRANCE
Construction of 1.1 km of tunnel, an underground station and 2 shafts.
Work : MARITIME WORK | Year : 2001-2005 | Location : FRANCE
Realisation of the first 4 quayside berths for Port 2000 operation (1,602m of length)
Work : MARITIME WORK | Year : 2005 - 2006 | Location : UNITED ARAB EMIRATES
The Dubai Drydocks naval shipyard has extended its capacities by commissioning a hydrolift for the construction and repair of floating equipment. This structure was entirely completed by Soletanche Bachy acting as the main contractor under a design and build contract.
Work : BUILDING,URBAN EXCAVATIONS | Year : 2005 | Location : MONACO
The construction of retaining walls 38m high in a cliff and earthworks tunneled with explosives.
Work : MARITIME WORK | Year : 2008 | Location : UNITED ARAB EMIRATES
Diaphragm wall and soil improvement works to create 4 precincts on reclaimed land
Work : METROS,RAILWAY WORKS,TUNNELS | Year : 1999 | Location : UNITED KINGDOM
Southwark station and tunnels between Waterloo and London Bridge.
Work : BUILDING,URBAN EXCAVATIONS | Year : 2003-2005 | Location : UKRAINE
Foundations and structural work for a tower with 31 floors and four basement levels.
Work : METROS,RAILWAY WORKS,SHAFTS,TUNNELS | Year : 1993 - 1996 | Location : FRANCE
Construction* of 2 150 linear metres of a 6.80 m dia. tunnel and three underground stations.