Techniques

Civil engineering

Regardless of site size, and providing it involves a significant proportion of works in the ground, Soletanche Bachy will handle the complete project, and all aspects of the works, including site supervision, excavations, foundations, civil engineering and all construction operations.

When it operates as a general contractor, Soletanche Bachy uses on its own resources to undertake all complex geotechnical operations, rather than relying on subcontractors.

Examples of structures constructed as general contractor

    - Underground car parks
    - Storage tanks and drainage
    - Cut and cover structures and tunnels
    - Marine and river construction

Download the Geotechnical and Main Contractors Works

EntrepriseGénéraleVa.pdf


Réalisations

Harlay car park

Work : UNDERGROUND CAR PARKS ,URBAN EXCAVATIONS | Year : 1997 | Location : FRANCE

Design and construction of 10-level 295 place underground car park.

A387.pdf

M'Bopicua

Work : MARITIME WORK | Year : 2002 - 2003 | Location : URUGUAY

Turnkey design and build contract for a port logistics terminal.

A452.pdf

Levesque tank

Work : SEWERAGE,STORM WATER TANK | Year : 2008 | Location : FRANCE

Construction of a 3,500m3 capacity storage tank.

A515.pdf

Underground car park Place d Arvieux

Work : UNDERGROUND CAR PARKS ,URBAN EXCAVATIONS | Year : 2006 2008 | Location : FRANCE

Construction as a main contractor of a cylindrical underground car park comprising 7 basement levels.

A537.pdf

Genk central lock

Work : MARITIME WORK | Year : 2007 | Location : BELGIUM

Rehabilitation of a river lock

A531.pdf

Marché Neuf car park

Work : UNDERGROUND CAR PARKS ,URBAN EXCAVATIONS | Year : 2005-2007 | Location : FRANCE

Acting as the main contractor for the construction of an underground car park in Saint-Germain-en-Laye

A453.pdf

Bourg - Bellegarde line - Contract 1

Work : RAILWAY WORKS,TUNNELS | Year : 2008 | Location : FRANCE

Upgrade of tunnels, creation of an underpass, construction of a bridge and other civil engineering works to modernize a railway.

A538.pdf

Saint-Michel car park

Work : UNDERGROUND CAR PARKS ,URBAN EXCAVATIONS | Year : 1997 | Location : FRANCE

Design and construction of 6-floor 430 place underground car park.

A310.pdf

Culture and Exhibition Centre

Work : BUILDING,URBAN EXCAVATIONS | Year : 1996 | Location : MONACO

A turnkey 17 000 m2 excavation.

A302.pdf

T 33 Tunnel

Work : ROAD STRUCTURES,TUNNELS | Year : 2005-2006 | Location : MONACO

Road tunnel excavated through rock, 55 to 85 m² excavated section

A510.pdf

Concarneau dry dock

Work : MARITIME WORK | Year : 2001 | Location : FRANCE

Design and construction as main contractor of dry dock, length 130m, width 27m, depth 10.80m.

A390.pdf

Baudoyer car park

Work : UNDERGROUND CAR PARKS ,URBAN EXCAVATIONS | Year : 1995 | Location : FRANCE

Design and construction of 5-level 320 place underground car park.

A311.pdf

McDermott Terminal

Work : MARITIME WORK | Year : 2009 | Location : MEXICO

Construction of a terminal for constructing and launching offshore oil platforms

A540.pdf

Brest - dry dock no1

Work : MARITIME WORK | Year : 2006-2008 | Location : FRANCE

Widening and modernisation of Dry Dock N°1 at the Brest Port de Commerce.

A477.pdf

Patras harbour extension - Phase 1

Work : MARITIME WORK | Year : 2004 | Location : GREECE

Construction of a breakwater and a quay wall made of box caissons.

A535.pdf

Terminal Cuenca del Plata

Work : MARITIME WORK | Year : 2009 | Location : URUGUAY

Constructing an extension to the Cuenca del Plata port terminal as a general contractor

A533.pdf

Grand Palais

Work : REHABILITATION OF STRUCTURES AND UNDERPINNING WORKS | Year : 2001 - 2003 | Location : FRANCE

Underpinning the “Grand Palais”, built in 1900 and protected as a National Heritage monument, and creating a new retaining wall for a future underground structure in the main hall.

A443.pdf

Toulouse metro, B Line, Contract No 3

Work : METROS,RAILWAY WORKS,SHAFTS,TUNNELS | Year : 2001 - 2005 | Location : FRANCE

Construction of 1.1 km of tunnel, an underground station and 2 shafts.

A528.pdf

Port 2000 quayside 1 to 4

Work : MARITIME WORK | Year : 2001-2005 | Location : FRANCE

Realisation of the first 4 quayside berths for Port 2000 operation (1,602m of length)

A462.pdf

Safina Dry Dock - Hydrolift

Work : MARITIME WORK | Year : 2005 - 2006 | Location : UNITED ARAB EMIRATES

The Dubai Drydocks naval shipyard has extended its capacities by commissioning a hydrolift for the construction and repair of floating equipment. This structure was entirely completed by Soletanche Bachy acting as the main contractor under a design and build contract.

A509.pdf

Monacan institute of sports medicine

Work : BUILDING,URBAN EXCAVATIONS | Year : 2005 | Location : MONACO

The construction of retaining walls 38m high in a cliff and earthworks tunneled with explosives.

A451.pdf

Al Raha Beach

Work : MARITIME WORK | Year : 2008 | Location : UNITED ARAB EMIRATES

Diaphragm wall and soil improvement works to create 4 precincts on reclaimed land

A541.pdf

Jubilee Line extension

Work : METROS,RAILWAY WORKS,TUNNELS | Year : 1999 | Location : UNITED KINGDOM

Southwark station and tunnels between Waterloo and London Bridge.

A266.pdf

Parus Office Center (Mechnikova Street)

Work : BUILDING,URBAN EXCAVATIONS | Year : 2003-2005 | Location : UKRAINE

Foundations and structural work for a tower with 31 floors and four basement levels.

A522.pdf

Lille metro, Line 2, section F

Work : METROS,RAILWAY WORKS,SHAFTS,TUNNELS | Year : 1993 - 1996 | Location : FRANCE

Construction* of 2 150 linear metres of a 6.80 m dia. tunnel and three underground stations.

A303.pdf


Voyage au coeur de l'ingénierie de pointe

Find out more about our expertise by: